Planning permission granted for first-of-kind Passivhaus development
Planning permission has been granted for a five-home Passivhaus development near Banchory, Aberdeenshire, which its developer says will be the first of its kind in North East Scotland.
Woodend of Glassel will be built by Insch-based Coldwells Build on a woodland site owned by Ursula and Adrian George for more than 20 years.
The scheme will comprise a mix of the company’s five-bedroom McKinley and four-bedroom Davidson house designs, each independently certified to the Passivhaus Standard.
READ MORE: Triton Construction delivers £12m sustainable manufacturing facility in Yorkshire

The development comes as Scotland prepares to introduce revised building standards intended to bring new homes closer to Passivhaus levels of energy performance, with guidance expected in 2027 and the new standard anticipated to take effect from 2029.
Prefabricated homes designed for energy efficiency
The homes will be prefabricated at Coldwells Build’s workshop in Insch, keeping construction skills, employment and quality control within the region. Glasgow-based John Gilbert Architects is responsible for the designs.
Passivhaus construction uses high levels of insulation, triple-glazed windows and an airtight building envelope to reduce heat loss and heating demand.
The press release states that a Passivhaus has 79% less heating demand than a home built to current Scottish building regulations.
Clare Booth, Director of Coldwells Build, said: “The first time I stood inside a Passivhaus, it felt different from any home I’d been in. It was quiet and comfortable, the air was fresh, and the surfaces weren’t cold to the touch. And it costs very little to heat. At Woodend of Glassel, people can experience Passivhaus living for themselves,”
Development ahead of planned Scottish standards
The planning approval comes ahead of changes to Scottish building regulations that are expected to introduce a Scottish equivalent of the Passivhaus Standard for new homes. Guidance is due in 2027, with implementation expected from 2029.
READ MORE: HBC Construction starts work on £18m Dewsbury Market redevelopment
Ross Booth, Director of Coldwells Build, said: “Scotland is about to raise the bar for every new home, so why wait? Woodend of Glassel is being built to the standard the rest of the industry is heading towards. The people who live here will have homes that are ready for the future from day one.”
The project has been brought forward by Coldwells Build in partnership with the landowners. The site contains mature Scots pine and silver birch woodland, with red squirrels among its wildlife. Each home will have a private garden of up to 1,500 sq m.
Ursula George said: “We wanted any development to respect what makes this setting so special, while creating high-quality homes that will serve people well for generations to come. We’re delighted to be working with Coldwells Build, offering homes that combine thoughtful design with exceptional energy efficiency,”
Regional construction and Passivhaus expertise
Founded in 2016 by Ross and Clare Booth, Coldwells Build is a family-run Passivhaus builder based in Insch, Aberdeenshire. The company offers pre-designed Passivhaus homes that can be adapted to suit individual clients and sites, and says it has a fully Passivhaus-trained workforce.
Woodend of Glassel will add five homes built to the voluntary energy-performance standard as Scotland prepares for changes to the requirements governing new residential construction.


















