Morro Partnerships starts timber frame assembly on £26m scheme
Morro Partnerships has started assembling timber frame structures on a £26 million affordable housing development in Rugby, marking a key construction milestone on the six-acre brownfield regeneration project.
The Projects Drive scheme is being delivered in partnership with housing association Orbit, with support from Homes England and the West Midlands Combined Authority (WMCA).
It will provide 108 new homes, including 72 for social rent and 36 for shared ownership.
Timber frame construction begins on 108-home development
The development is using modern methods of construction (MMC), with timber frames manufactured off site at Morro’s Innovation Hub in Leicester before being transported to Projects Drive for assembly.
READ MORE: BMF announces 2026 finalists for building materials industry awards

The 9,000 sq ft facility has been designed to maximise manufacturing efficiency and has capacity to produce between 300 and 400 units a year.
The timber frame approach is intended to improve construction efficiency while reducing material waste and supporting consistent build quality.
Simon Preston, Managing Director at Morro Partnerships, said: “The start of timber frame assembly is an exciting milestone for the Projects Drive development and a visible sign of the progress being made on site.
“Through our use of MMC, we’re able to build homes more efficiently while also reducing carbon.”
Off-site manufacturing supports construction programme
Timber frame construction accounts for around 23% of new-build homes in the UK and can allow follow-on trades to begin work earlier in the construction programme.
READ MORE: Mayoral planning powers could unlock development but new levy risks adding to costs
Once the timber structures are made watertight, internal trades can work within the homes without waiting for external brickwork facades to be completed.
Morro said this can shorten construction programmes while providing a consistent structural platform for subsequent trades.
Preston added: “Timber frame construction allows us to reduce waste, improve build quality, speed up delivery and create homes with excellent thermal performance.”
The approach is particularly relevant to the delivery of the Projects Drive scheme, where the first handovers are expected by the end of 2026 and final handovers are scheduled for late 2027.
£26m brownfield scheme to deliver affordable homes
The development will comprise a mix of one- and two-bedroom apartments, one-bedroom maisonettes and two-, three- and four-bedroom houses.
READ MORE: Sir Robert McAlpine reports 33% cut in carbon emissions
Of the 108 homes, 72 will be delivered for social rent and 36 through shared ownership.
Orbit said the scheme has been designed to respond to local housing requirements, with almost one-third of the homes being one-bedroom properties for social rent.
Phil Andrew, Group Chief Executive at Orbit, said: “We’re delighted to see the first timber frames laid down at Projects Drive, marking a key moment as we work together with Morro Partnerships and the West Midlands Combined Authority to build more much-needed, quality affordable housing in Rugby.”
Construction scheme supports wider Brownsover regeneration
Projects Drive is also expected to support the potential redevelopment of Orbit’s nearby Hollowell Way estate in Brownsover.
The scheme will provide additional housing capacity that could support the rehousing of existing residents if the proposed estate regeneration progresses.
READ MORE: PERI UK challenges misconceptions around system scaffolding
The WMCA has invested £2.5 million in the Projects Drive development, with the wider project intended to contribute to the regeneration of the surrounding area.
The development brings together Morro’s construction and MMC capabilities with Orbit’s affordable housing delivery experience, with timber frame assembly now progressing on site.


















