Morgan Sindall set to deliver £17m Greenway Junior School redevelopment

By Published On: September 15th, 2026Categories: News, Top Stories

Morgan Sindall Construction has been appointed to deliver the £17m redevelopment of Greenway Junior School in Horsham through the Department for Education’s School Rebuilding Programme.

The Southern Home Counties business will construct a new two-storey school alongside new external teaching spaces, a playground, multi-use games area (MUGA) pitch and playing field.

The existing school buildings will be progressively demolished once pupils and staff have moved into the new facility.

READ MORE: Universal names contractors and consultants for UK theme park

Morgan Sindall

The project also includes a new access road and additional parking for the existing nursery. Existing on-site parking will be retained, with 11 additional spaces being created, including five accessible bays.

New two-storey school and SEN facilities

The new school will provide 12 classrooms alongside an assembly hall, sports facilities, library, food technology room and group rooms.

Other accommodation will include a reception and lobby, WC facilities, staff workspace and kitchen.

A self-contained Special Educational Needs (SEN) suite will also be provided, with direct access to a dedicated external play area.

ECE Architecture is the lead consultant on the project.

READ MORE: Casamia Homes Director on a construction career sparked by Derby’s Pride Park

Guy Hannell, Area Director for Morgan Sindall Construction in the Southern Home Counties, said: “Greenway Junior School will give pupils a modern, sustainable learning environment built with their needs, and the local community’s, front of mind.

“From the dedicated SEN facilities to the fossil-fuel-free heating system, every single part of this project has been designed to last well beyond the day the doors open. We’re incredibly proud to have been appointed and look forward to getting started on site.”

School project targets net zero carbon in operation

The development has been designed to achieve Net Zero Carbon in Operation in line with the DfE Output Specification 2021.

Air source heat pumps will provide the primary heating, with the equipment located on the roof within an acoustic enclosure. The system will supply a low-temperature hot water circuit serving radiant panels in the main hall and hybrid ventilation units with heat recovery in classrooms.

Photovoltaic panels will form part of a bio-solar roof system to provide on-site renewable energy.

The scheme will also incorporate sustainable drainage measures, including swales, permeable paving and attenuation basins, designed to reduce the additional load on the local sewer network.

READ MORE: MP tours Cambridgeshire development as construction progresses

The site has been designed to achieve a 4% Biodiversity Net Gain.

Carbon reduction measures during construction and operation will be incorporated using the digital carbon calculation tool CarboniCa. The tool will also be used at project completion to audit actual carbon performance during construction.

Construction project to provide local skills opportunities

Morgan Sindall Construction will deliver a range of social value commitments alongside the school development.

The contractor will spend 60 hours in schools providing information on construction careers and will support four apprentices and four T Level placements during the project.

A further 10 work experience placements will be provided, alongside 80 hours of support to help local people access employment opportunities.

The project will also include 84 hours of volunteering by the tier one contractor to support local community initiatives.

Share

SUBSCRIBE
To receive the latest industry news direct to your inbox!