GOLDBECK completes new amenity hub at London Gateway

By Published On: October 28th, 2026Categories: Top Stories

GOLDBECK has completed The Hive, a 1,500 sq m amenity building at DP World London Gateway logistics hub in Stanford-le-Hope, Essex, providing office space, leisure facilities and shared workspaces across three levels.

The building, located on Ocean Boulevard, was delivered by GOLDBECK as principal contractor, including the external infrastructure. It is designed to serve businesses operating at the logistics park and the surrounding community.

Facilities include office accommodation, shared workspaces, food and beverage areas, a gym, a multi-use games area (MUGA) and a padel court.

READ MORE: Tilbury Douglas marks Applebee Wood School construction milestone

GOLDBECK

Several amenities are available to the local community outside standard operating hours, while provision has also been made for a creche at a later stage.

Atrium and glazed façade define building design

The three-storey building features a full-height central atrium extending to the underside of the roof, bringing natural light into the internal spaces and connecting the different levels.

Suspended feature lighting enhances the atrium, which forms the focal point of the interior.

The external design combines a full-height structural glazed façade with copper-clad reveals and curtain walling. Recessed architectural lighting gives the building a distinctive appearance after dark.

Stephen George & Partners LLP developed the design and acted as CDM Principal Designer.

READ MORE: BESA warns building engineering firms to set AI guardrails

Internally, glazed partitions, folding elements and dry-lined walls provide flexibility for different uses, from private offices to shared working areas. Exposed structural steelwork and building services contribute to the building’s industrial aesthetic.

Pedestrian and cycle links integrated into scheme

External works include a purpose-built pedestrian footbridge and cycleway providing access to the building. The bridge incorporates a timber-capped mesh balustrade, integrated lighting and resin-bound gravel finishes.

Cycle storage, sheltered seating and defined external routes have also been provided to support access and encourage sustainable travel.

The wider landscaping scheme includes wild grass planting, hedgerows and new trees. Other external facilities include the MUGA, padel court, outdoor seating areas and a car park with electric vehicle charging points.

Building intended to support growing logistics community

Dan Bennett, Head of Project Management Logistics at GOLDBECK in the UK, said: “The Hive supports the day-to-day needs of businesses operating within the DP World London Gateway site while also creating a space that extends beyond working hours. The building will serve a wider purpose to the community making it a shared space for business and residential use.”

READ MORE: Greystar secures approval for 387 rental homes in Cambridgeshire

Alan Holland, Chief Executive Officer at DP World London Gateway Logistics Park, said: “As the London Gateway Logistics Hub continues to grow, we want to ensure the infrastructure around it grows too.

“With The Hive now complete, we are creating a space where businesses can collaborate, employees can thrive and the local community can develop the skills needed to access new opportunities.

“London Gateway now supports more than 10,000 jobs through on-site employment and its role in the wider economy, and is already home to a growing community of some of the world’s leading businesses.

“The Hive gives that community a new place to come together. Alongside Thames Freeport, we are investing not only in the physical infrastructure of the site, but in the skills and amenities that will support its growth for many years to come.”

Share

SUBSCRIBE
To receive the latest industry news direct to your inbox!